
ADRIAN — Starting June 9, 2025, the City of Adrian will begin resurfacing several streets as part of a planned infrastructure improvement project. The work will involve a multi-layer process, including asphalt emulsion and fine aggregate, which may temporarily affect travel and parking.
During this period, parking will not be allowed on affected streets. Vehicles left in the roadway may be towed at the owner’s expense. Residents and drivers should also expect temporary street closures, loose gravel, dust clouds, and areas with sticky, tar-like material.
City officials are advising the public to avoid the listed streets whenever possible during the project. If travel through the affected areas is necessary, drivers are urged to reduce speed and proceed with caution.
The streets affected are:
- Kimole – Riverside to Riverside
- Enterprise Dr – Extents
- Scottdale – Scott to Frazier
- Frazier – Scottdale to Oram
- Caton – Extents
- Howell – Extents
- Summit – Extents
- College Park Sub.
- McKenzie – Maple to Maumee
- Budlong – Maple to Maumee
- Dawes – Extents
- Washburn – Main to Winter
- Madison Dr. – Extents
- Lakeshire – Kimole to Riverside
- Industrial Ct – Extents
- Scottdale Ct – Extents
- Oram – Scott to Frazier
- Hoch – Extents
- Baker – Extents
- South – Extents
- Meadowview Subdivision
- Treat – Extents
- Metcalf – Extents
- Tabor – Beecher to Tracks
- E. Beecher – Main to City Limits
- Rich – Budlong to McKenzie